Skip to content
Istanbul Airport - Terminal Building
Antalya Expo Centre
King Abdullah Stadium

Structural Steel Solutions for Industrial Facilities

A 34,350-tonne reference portfolio spanning airport terminals, stadiums, automotive plants and rolling mills. Fabrication and site erection under one contract.

01 / 03

34,350

Tonnes of reference steel across completed and ongoing projects

1,500

Tonnes per month capacity, 18,000 tonnes a year

22,000

m² of covered production area across two plants

100+

Completed projects across 10+ countries and regions

An Engineering Company Built on International Contracting Experience

Sinay Çelik was founded to bring the experience its principals gained over many years on international contracting projects back to Türkiye, with the aim of contributing to the sector and taking approaches that had not been tried before.

Our plants are in Kocaeli, one of Türkiye's largest industrial cities, just 90 km from Istanbul. With 34 ports along the Black Sea and Marmara coastline and its industrial waterways, Kocaeli offers a strong logistics position.

Production capacity
1,500 tonnes / month
Covered area
22,000 m²
Location
Arslanbey OSB, Kartepe / Kocaeli
Certification
EN 1090 · ISO 9001 · ISO 14001

Company Profile

Steel fabrication at the Sinay Celik production facility
1,500 tonnes Monthly production capacity

How We Deliver a Project

A documented five-stage process. Each stage produces the input for the next; the delivery schedule is planned in erection sequence.

Quotation and survey 01

Quotation and survey

Review of the project file, quantity take-off and definition of the erection method.

Detail engineering 02

Detail engineering

3D modelling, structural analysis and preparation of shop drawings for approval.

Shop fabrication 03

Shop fabrication

Cutting, drilling, assembly and welding; production control under EN 1090-2.

Surface treatment and painting 04

Surface treatment and painting

Surface preparation, primer and top coat; final inspection before dispatch.

Site erection 05

Site erection

Crane plan, erection sequence, site welding and completion of the handover file.

Quality Management and Certification

Our fabrication is certified under EN 1090-1 and EN 1090-2 Factory Production Control, and our welding processes under EN ISO 3834-2. Pressure vessel work references ASME BPVC and PED 2014/68/EU.

Every job carries a traceable file: material certificates, welding procedures, welder qualifications, non-destructive testing reports and coating thickness measurements are handed over on delivery.

EN 1090-2Execution of Steel and Aluminium Structures
EN ISO 3834-2Quality Requirements for Fusion Welding
EN 1090-1Conformity Assessment
PED 2014/68/EUPressure Equipment Directive
01

Predictable schedule

The fabrication programme follows the erection sequence; every delivery to site carries the pieces to be erected that week.

02

Documented quality

Under EN 1090 Factory Production Control and EN ISO 3834-2, every fabrication has a traceable file.

03

A single point of contact

Every stage from engineering to site erection runs under one contract; nothing is lost at the interfaces.

Frequently Asked Questions

The six questions most often raised at the quotation stage. For anything else, please use the contact form.

Structural steelwork, piping systems, tanks, silos and cyclones, pressure vessels and turnkey industrial plants. We can carry a job from detail engineering through to site erection under a single contract.

Our two plants in Kartepe, Kocaeli have 22,000 m² of covered area in total and operate at 1,500 tonnes a month, 18,000 tonnes a year.

We hold a Factory Production Control certificate under EN 1090-1 and EN 1090-2, and an EN ISO 3834-2 Quality Requirements for Fusion Welding certificate. ASME BPVC and PED 2014/68/EU are referenced in pressure vessel manufacturing.

Yes. On the King Abdullah Stadium project in Jeddah, Saudi Arabia we fabricated and erected 1,350 tonnes of steel load-bearing system and roof steelwork; we have also delivered work in Kazakhstan, Norway and Germany.

We do both. Most of our reference projects cover fabrication and site erection together. A request for workshop fabrication only can also be met.

Shop drawings or a concept design, a bill of quantities, the delivery location, the target erection schedule and the coating system are enough. From this we establish the scope and come back to you with a price and a programme.

Request a Quote for Your Project

Fabrication drawings, a tonnage list or a preliminary design is enough. We review the scope and respond with a schedule and pricing.

Request a quote