TOGG Automotive Plant
Column and truss fabrication
1,860 t · Automotive · 2019-2021

100+ reference projects, 8+ sectors, 34,350 tonnes of structural steel in total. From airport terminals to stadiums, from car plants to rolling mills.
Our structural steel references run from airport terminals to stadium roofs, from automotive plants to cold rolling mills. On every project, fabrication and site erection were carried out together under a single contract.
1,710 t / Sports and Events / 2026
Antalya Expo Centre
Completed Projects | {tons} Tonnes of Steel
502 t / Sports and Events / 2026
Antalya Expo Green Zone
Completed Projects | {tons} Tonnes of Steel
1,350 t / Sports and Events / 2024
King Abdullah Stadium
Completed Projects | {tons} Tonnes of Steel
260 t / Food Industry / 2025
TAMEK Salihli Pipe Bridge
Completed Projects | {tons} Tonnes of Steel
1,550 t / Healthcare Buildings / 2024
Erzin Emergency Hospital
Completed Projects | {tons} Tonnes of Steel
1,111 t / Storage and Logistics / 2023 - 2024
OYAK Synthetic Carbon Warehouse Building
Completed Projects | {tons} Tonnes of Steel
88 t / Automotive / 2023
Robo Otomasyon - TOGG Sedan Production Line
Completed Projects | {tons} Tonnes of Steel
1,860 t / Automotive / 2019 - 2021
TOGG Automotive Plant - Column and Truss Fabrication
Completed Projects | {tons} Tonnes of Steel
6,500 t / Aviation / 2016 - 2018
Istanbul Airport - Terminal Building
Completed Projects | {tons} Tonnes of Steel
750 t / Aviation / 2016 - 2018
Istanbul Airport - Secondary Truss Fabrication
Completed Projects | {tons} Tonnes of Steel
250 t / Aviation / 2016 - 2018
Istanbul Airport - Hangar Building Mezzanine
Completed Projects | {tons} Tonnes of Steel
980 t / Energy and Process / 2019
Thyssen Group - Power House and Conveyor Lines
In progress
3,437 t / Metallurgy / Devam ediyor
Habaş Cold Rolling Mill Building
There are no projects listed in this sector.
Works recorded in our corporate presentation, each with a fixed scope. All were completed either as fabrication, or as fabrication and erection.
Column and truss fabrication
1,860 t · Automotive · 2019-2021
Terminal building fabrication and erection
6,500 t · Aviation
Secondary truss fabrication
750 t · Aviation
Hangar building mezzanine fabrication and erection
250 t · Aviation
Modern Karton pipe bridges
385 t · Energy and Process · 2022
Warehouse building
370 t · Storage and Logistics · 2015
Mine storage building
252 t · Storage and Logistics · 2023
Stainless steel radiant fabrication
220 t · Energy and Process
TOGG sedan production line
88 t · Automotive · 2023
Indoor swimming pool, Kocaeli
Sports and Events
Acid vessel fabrication, Kazakhstan
Energy and Process
Collector fabrication, Kazakhstan
Energy and Process
İlter warehouse, steel fabrication and erection
438 t · Storage and Logistics · 2023
Cooling tower fabrication and erection
Energy and Process · 2024
Maintenance building steelwork, Hatay
120 t · Storage and Logistics · 2024
Projects listed in our corporate catalogue. The tonnages in the rows total 34,350 tonnes.
| Project | Client | Tonnage | Period | Duration | Location |
|---|---|---|---|---|---|
| İstanbul Havalimanı | AKSAL | 6,500 t | 2017-2018 | 24 months | Istanbul |
| KT Broiles - Paslanmaz | Modül | 220 t | 2020 | 4 months | Kocaeli |
| Vest Stal Construktion | Norse | 680 t | 2022 | 3 months | Kocaeli / Norway |
| TOGG Araba Fabrikası | Olmetsan | 1,800 t | 2022 | 5 months | Bursa |
| Boru Köprüleri | Yimak | 750 t | 2022-2023 | 5 months | Manisa |
| OSK Depo | Yimak Proje İnş. | 1,300 t | 2023 | 8 months | Hatay |
| Kral Abdullah Stadyumu | Norse | 1,350 t | 2024 | 3 months | Jeddah / Saudi Arabia |
| Acil Durum Hastanesi | Akfen İnşaat | 1,551 t | 2024 | 3 months | Hatay |
| Habaş Dökümhane | NEG | 9,980 t | 2024-2026 | 36 months | Izmir |
| Tamek Salça Fabrikası | Domino GYO | 451 t | 2025 | 2 months | Manisa |
| Türköz | Türköz İnşaat | 937 t | 2025 | 7 months | Kocaeli |
| Telsan Antrepo | Sismotek | 318 t | 2025 | 2 months | Kocaeli |
| THY Uçuş Eğitim Merkezi | Adım GYO | 2,800 t | 2026 | 3 months | Istanbul |
| Antalya Expo Fuar Alanı | Özyazıcı İnşaat | 2,250 t | 2026 | 2 months | Antalya |
| Atölye ve Makine Parkı Binaları | DESCO International | 60 t | 2026 | 1 month | Manching / Germany |
| Antrepo İmalatı | Akkaya İnşaat | 2,600 t | 2026 | 3 months | Kocaeli |
| Calderys / Haznedar Durer | Calderys Silivri | 272 t | 2026 | 1 month | Istanbul |
| ISKA Otel | Kalyon | 531 t | 2026 | Ongoing | Istanbul |
Fabrication drawings, a tonnage list or a preliminary design is enough. We review the scope and respond with a schedule and pricing.