Thyssen Group - Power House and Conveyor Lines
980 tonnes of steelwork for a power house and conveyor lines of critical importance to the industrial sector.
- Structural steel
- 980 t
- Sector
- Energy and Process
- Scope
- Fabrication and erection
- Year
- 2019
About the Project
The Thyssen Group Power House and Conveyor Lines project is one of the large-scale industrial structures we have completed. It covers the construction of a facility of critical importance to the industrial sector and was carried out to high standards suited to sectoral requirements.
A total of 980 tonnes of building material was used on the project. Built with modern engineering solutions, the power house and conveyor lines were designed with operational efficiency and durability in mind.
The conveyor lines were designed to a high level of reliability in order to optimise production and material handling. All work was completed within the agreed time and quality standards.
Request a Quote for Your Project
Fabrication drawings, a tonnage list or a preliminary design is enough. We review the scope and respond with a schedule and pricing.